Skip to content

Latest commit

 

History

History
569 lines (462 loc) · 12.8 KB

File metadata and controls

569 lines (462 loc) · 12.8 KB

🗺️ CommerceRack b00t Rust Translation - Checkpoint Roadmap

Philosophy: Plan → Checkpoint → Validate → Backtrack if needed → Iterate

Checkpoint Strategy

Each checkpoint includes:

  1. Plan: Clear objectives and acceptance criteria
  2. Execute: Implement with tests
  3. Validate: Run tests, verify functionality
  4. Commit: git commit with descriptive message
  5. Backtrack Option: Revert if validation fails

Phase 1: Foundation ✅ COMPLETE

Checkpoint 1.1: Repository Setup ✅

Commit: f52d6fa

  • Analyze MySQL schema (152 tables)
  • Analyze Perl codebase (318 modules)
  • Create Postgres migration (22 tables)
  • Set up Cargo workspace
  • Implement database layer
  • Validation: Schema loads, models compile
  • Backtrack: None needed ✅

Checkpoint 1.2: Multi-Agent Infrastructure ✅

Commit: 6ec6524

  • Create pm2 ecosystem (8 agents)
  • Implement captain orchestrator
  • Create specialist agent workers
  • Set up OpenTofu k0s infrastructure
  • Create deployment documentation
  • Validation: Agents start, infrastructure provisions
  • Backtrack: None needed ✅

Phase 2: Core Module Translation (NEXT)

Checkpoint 2.1: Customer Module Foundation

Branch: feature/customer-module Estimated: 1-2 days

Plan:

  1. Create crates/customer/src/lib.rs
  2. Define Customer struct with all fields from Perl
  3. Implement basic CRUD operations with SQLx
  4. Add unit tests for each operation
  5. Create integration tests with testcontainers

Acceptance Criteria:

  • Customer struct matches CUSTOMER.pm fields
  • All CRUD operations work against Postgres
  • Unit tests pass (>80% coverage)
  • Integration tests pass with real DB

Validation Steps:

cargo test --package commercerack-customer
cargo clippy -- -D warnings
cargo build --release

Backtrack Plan: If tests fail or design issues found:

git reset --hard HEAD~1
# Review Perl implementation again
# Adjust Rust design
# Retry with new approach

Checkpoint 2.2: Customer Authentication

Branch: feature/customer-auth Depends on: Checkpoint 2.1

Plan:

  1. Implement password hashing with argon2
  2. Add salt generation per customer
  3. Create authentication methods
  4. Add session management
  5. Write security tests

Acceptance Criteria:

  • Passwords hashed with argon2id
  • Unique salt per customer
  • Login/logout methods work
  • Session tokens generated (JWT ready)
  • Security audit passes

Validation Steps:

cargo test customer::auth
# Run security agent analysis
pm2 trigger security-agent analyze

Backtrack Plan:

git reset --soft HEAD~1
# Review security recommendations
# Adjust crypto implementation

Checkpoint 2.3: Customer Address Management

Branch: feature/customer-addresses Depends on: Checkpoint 2.1

Plan:

  1. Create CustomerAddress model
  2. Implement address CRUD
  3. Add address type enum (SHIP, BILL, etc.)
  4. Link to customer records
  5. Test multi-address scenarios

Acceptance Criteria:

  • Address model complete
  • Multiple addresses per customer
  • Address types properly validated
  • Tests cover edge cases

Validation Steps:

cargo test customer::address

Phase 3: Product & Inventory

Checkpoint 3.1: Product Catalog

Branch: feature/product-catalog Estimated: 2-3 days

Plan:

  1. Create crates/product/
  2. Translate PRODUCT.pm to Rust
  3. Implement YAML/JSON serialization
  4. Add product options (POGs)
  5. Create comprehensive tests

Acceptance Criteria:

  • Product struct complete
  • YAML data fields work
  • Options/variations supported
  • Tests pass

Validation Steps:

cargo test --package commercerack-product
# Test with sample product data from Perl

Backtrack Plan:

git stash
# Re-examine Perl POG structure
# Redesign Rust approach
git stash pop

Checkpoint 3.2: SKU Lookup System

Branch: feature/sku-lookup Depends on: Checkpoint 3.1

Plan:

  1. Implement SkuLookup model (60+ fields!)
  2. Add inventory tracking
  3. Amazon integration fields
  4. Repricing strategy support
  5. Performance tests

Acceptance Criteria:

  • All 60+ SKU fields mapped
  • Inventory quantities tracked
  • Indexes perform well
  • Bulk operations efficient

Validation Steps:

cargo test sku::lookup
# Benchmark bulk operations
cargo bench

Phase 4: API Layer

Checkpoint 4.1: Axum Server Skeleton

Branch: feature/axum-api Estimated: 1 day

Plan:

  1. Create jsonapi/ binary crate
  2. Set up Axum router
  3. Add middleware (logging, CORS, auth)
  4. Create health check endpoint
  5. Docker build test

Acceptance Criteria:

  • Server starts on port 8000
  • Health check responds
  • Middleware chain works
  • Docker build succeeds

Validation Steps:

cargo run --bin jsonapi
curl http://localhost:8000/health
docker build -t commercerack-rust .

Backtrack Plan:

git reset HEAD~1
# Review Axum patterns
# Simplify middleware setup

Checkpoint 4.2: Customer API Endpoints

Branch: feature/api-customers Depends on: Checkpoints 2.1, 4.1

Plan:

  1. Add /v1/customers routes
  2. Implement GET, POST, PUT, DELETE
  3. Add request validation
  4. Create response DTOs
  5. Integration tests

Acceptance Criteria:

  • All CRUD endpoints work
  • Validation rejects bad input
  • Error handling consistent
  • Integration tests pass

Validation Steps:

cargo test api::customers
# Manual API testing
curl -X POST http://localhost:8000/v1/customers \
  -H "Content-Type: application/json" \
  -d '{"email":"test@example.com"}'

Phase 5: Cart & Checkout

Checkpoint 5.1: Cart Data Model

Branch: feature/cart-model Estimated: 3-4 days (complex!)

Plan:

  1. Create crates/cart/
  2. Translate CART2.pm structure (12,630 LOC 😱)
  3. Break into sub-modules:
    • cart/items
    • cart/pricing
    • cart/shipping
    • cart/tax
  4. Progressive implementation
  5. Extensive tests

Acceptance Criteria:

  • Cart struct complete
  • Item management works
  • Sub-modules well organized
  • Unit tests >70% coverage

Validation Steps:

cargo test --package commercerack-cart
# Test with Perl test cases

Backtrack Plan:

# If cart design too complex
git reset --hard feature/cart-model~1
# Simplify: MVP first, features later
# Restart with minimal cart

Checkpoint 5.2: Cart Calculations

Branch: feature/cart-calculations Depends on: Checkpoint 5.1

Plan:

  1. Implement subtotal calculation
  2. Add tax calculation
  3. Shipping cost integration
  4. Discount/promo codes
  5. Performance benchmarks

Acceptance Criteria:

  • Calculations match Perl results
  • Performance <50ms for typical cart
  • Edge cases handled
  • Benchmarks documented

Validation Steps:

cargo test cart::calculations
cargo bench --bench cart_perf
# Compare with Perl baseline

Phase 6: Payment Integration

Checkpoint 6.1: Payment Gateway Trait

Branch: feature/payment-trait Estimated: 1 day

Plan:

  1. Create crates/payment/
  2. Define PaymentGateway trait
  3. Add common error types
  4. Create mock implementation
  5. Design auth/capture/refund flow

Acceptance Criteria:

  • Trait well-defined
  • Mock gateway works
  • Error handling complete
  • Tests pass

Validation Steps:

cargo test payment::mock

Checkpoint 6.2: Authorize.Net Integration

Branch: feature/authorizenet Depends on: Checkpoint 6.1

Plan:

  1. Implement AuthorizeNet gateway
  2. Add API client (reqwest)
  3. Transaction creation
  4. Refund/void operations
  5. Integration tests (sandbox)

Acceptance Criteria:

  • API client works
  • Charge succeeds (sandbox)
  • Refunds work
  • Tests use sandbox credentials

Validation Steps:

cargo test payment::authorizenet
# Sandbox integration test
AUTHNET_SANDBOX=true cargo test --test integration

Backtrack Plan:

git checkout feature/payment-trait
# Adjust trait if needed
# Restart gateway implementation

Phase 7: Database Completion

Checkpoint 7.1: Marketplace Tables (eBay)

Branch: feature/ebay-schema Estimated: 1 day

Plan:

  1. Create migrations/002_ebay_tables.sql
  2. Migrate 9 eBay tables
  3. Convert ENUMs, fix dates
  4. Add indexes
  5. Test migration

Acceptance Criteria:

  • All 9 eBay tables created
  • Migration runs cleanly
  • Indexes present
  • Rollback works

Validation Steps:

psql commercerack < migrations/002_ebay_tables.sql
psql commercerack -c "\dt ebay*"
# Test rollback
psql commercerack < migrations/002_ebay_tables_down.sql

Backtrack Plan:

# If migration fails
psql commercerack < migrations/002_ebay_tables_down.sql
# Fix issues
# Re-apply

Checkpoint 7.2: Remaining Tables (130 total)

Iterative: Break into 10-15 table batches Estimated: 1 week

Plan: Create migrations 003-010 for remaining tables:

  • 003: Supplier tables (6 tables)
  • 004: Shipping tables (8 tables)
  • 005: Warehouse tables (3 tables)
  • 006: Marketing tables (10 tables)
  • 007: Google/Sears marketplaces (5 tables)
  • 008: Reporting tables (15 tables)
  • 009: Miscellaneous infrastructure (20 tables)
  • 010: Legacy/archive tables (remaining)

Per-migration Validation:

psql commercerack < migrations/00X_*.sql
psql commercerack -c "\dt" | wc -l  # Table count
# Rollback test
psql commercerack < migrations/00X_*_down.sql

Checkpoint Best Practices

Before Each Checkpoint

# 1. Create feature branch
git checkout -b feature/checkpoint-name

# 2. Plan in detail (write acceptance criteria)
# 3. Write tests FIRST (TDD)
# 4. Implement feature
# 5. Run validation

# 6. If validation PASSES:
git add .
git commit -m "Checkpoint: Feature name

Acceptance criteria:
- [x] Criterion 1
- [x] Criterion 2

Validation:
- cargo test passed
- benchmarks acceptable
- security audit clean
"

# 7. If validation FAILS:
git reset --hard HEAD  # Nuclear option
# OR
git reset --soft HEAD~1  # Keep changes, redo commit
# OR
git stash  # Save for later analysis
# OR
git revert HEAD  # Explicit undo commit

Validation Checklist Per Checkpoint

  • cargo test passes (all crates)
  • cargo clippy no warnings
  • cargo build --release succeeds
  • Integration tests pass
  • Performance acceptable (if applicable)
  • Security review (if applicable)
  • Documentation updated

Recovery Commands

# View checkpoint history
git log --oneline --graph

# Return to specific checkpoint
git checkout <commit-hash>

# Create new branch from checkpoint
git checkout -b feature/new-approach <commit-hash>

# Compare checkpoints
git diff checkpoint-1 checkpoint-2

# Cherry-pick successful changes
git cherry-pick <commit-hash>

Current Status

Completed Checkpoints: 2

  • ✅ 1.1: Repository Setup (f52d6fa)
  • ✅ 1.2: Multi-Agent Infrastructure (6ec6524)

Next Checkpoint: 2.1 Customer Module Foundation Estimated Start: When infrastructure deployment validated Estimated Duration: 1-2 days

Branch Strategy:

main (protected)
  └── claude/perl-to-rust-b00t-01KhRNNMTqUTNuksyRwUnPW2 (current work)
        ├── feature/customer-module (next)
        ├── feature/customer-auth
        ├── feature/product-catalog
        └── ... (future features)

Success Metrics Per Phase

Phase Checkpoints Tests Coverage Performance
Phase 1 2/2 ✅ N/A N/A N/A
Phase 2 0/3 TBD >80% <100ms/op
Phase 3 0/2 TBD >70% <50ms/query
Phase 4 0/2 TBD >80% <200ms/req
Phase 5 0/2 TBD >70% <50ms/calc
Phase 6 0/2 TBD >75% <500ms/txn
Phase 7 0/2 N/A N/A N/A

Emergency Backtrack Scenarios

Scenario 1: Design Fundamentally Flawed

# Return to last known good checkpoint
git reset --hard <last-good-commit>
# Re-analyze Perl implementation
# Create new design document
# Start fresh feature branch

Scenario 2: Performance Unacceptable

# Keep implementation but benchmark
git stash
# Profile and identify bottleneck
# Optimize specific function
git stash pop
# Re-run benchmarks

Scenario 3: Tests Failing After Merge

# Bisect to find breaking commit
git bisect start
git bisect bad HEAD
git bisect good <last-known-good>
# Git will checkout commits to test
cargo test && git bisect good || git bisect bad
# Once found, analyze and fix

Roadmap Philosophy:

"Plan step-by-step, checkpoint frequently, validate rigorously, backtrack fearlessly." 🥾

Each checkpoint is a stable platform to either advance or retreat from. No work is wasted - even failed checkpoints teach us what NOT to do.