Skip to content

upgrade to v0.61.0

upgrade to v0.61.0 #95

Triggered via push February 28, 2026 07:27
Status Failure
Total duration 1m 6s
Artifacts

rust.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
compile-no-std
Process completed with exit code 101.
lint
Process completed with exit code 101.
test (stable)
Process completed with exit code 101.
test (nightly)
The strategy configuration was canceled because "test.stable" failed
test (nightly)
The operation was canceled.
test (beta)
The strategy configuration was canceled because "test.stable" failed
test (beta)
The operation was canceled.