Skip to content

Latest commit

 

History

History
108 lines (86 loc) · 6.98 KB

community-triage.md

File metadata and controls

108 lines (86 loc) · 6.98 KB

Community Triage

This is the shared triage contract for Base, base-cli, and base-bash-libs. It turns a public question into an issue that a contributor can understand, claim, implement, and hand off for review. It complements the public support and discussion policy; it does not replace repository-specific bug, security, release, or test requirements.

Response target

The working target is to acknowledge or triage a clear public question within 7 calendar days when capacity allows, and to provide a substantive next step, evidence request, or honest deferral within 14 calendar days. These are service targets, not a promise that every issue will be answered.

If a question is unanswered after 14 days, add one concise follow-up with the missing context. At the next monthly review, either keep it open with an explicit next step, request reproduction evidence, move it to design, or close it with a human-readable reason. Do not auto-close an issue solely because it is old.

Labels

Use the existing repository category label (bug, enhancement, documentation, ci, or security) as the primary classification. The shared community labels are:

Label Meaning Use it when
good first issue A narrow task that an outside contributor can complete with public documentation and tools Acceptance criteria and validation are explicit; no private architecture or cross-repository setup is required
help wanted Maintainers welcome an outside contribution The work is contribution-ready, even when it is not a first issue
needs design An explicit design decision is still required Do not advertise the issue as starter work until the decision is recorded
needs reproduction Evidence is insufficient to triage behavior Request version, environment, and minimal reproduction without requesting secrets
adoption support The issue concerns onboarding, usage, or an adopter-facing support gap Route broad questions to Discussions first
area: docs Documentation and public guidance ownership Use for docs, templates, and public policy work
area: runtime Runtime, lifecycle, execution, or process-boundary ownership Use for behavior in those surfaces
area: release Release, packaging, provenance, or distribution ownership Use for release and installer surfaces
area: community Community health, triage, support, or contributor experience ownership Use for community operations

Repository-specific area or Project fields remain authoritative where they already exist. Do not add a maintainer as the default assignee to a community report; assignment means someone has explicitly accepted the next action.

Issue lifecycle

State Entry bar Exit evidence
Idea A question, proposal, or reported need exists The owner and desired outcome are clear, or the item is redirected to Discussions
Ready Goal, scope, acceptance criteria, validation, and non-goals are present A contributor or maintainer claims the next action
In progress The claimant has commented, opened the issue branch, or linked a draft PR A focused PR or an explicit decision is ready for review
Review The PR links the issue, explains validation, and has the repository's checks running Review comments are resolved and the PR is merged or superseded
Done The change or decision is complete The issue is closed with the merged PR, release, workaround, or reason

Claiming work

Before starting, search open branches and pull requests for the issue number and comment with the intended scope. A maintainer can acknowledge the claim, point to an existing effort, or identify a dependency. Do not create a second PR when one is already active. If no acknowledgement arrives, keep the claim in the issue and make the smallest visible draft or evidence update; do not assume exclusive ownership indefinitely.

Starter queue baseline

As of 2026-09-14, the initial outside-contributor queue contains eight open, focused issues. Each has documentation, good first issue, help wanted, and area: docs; none requires private workspace knowledge.

Repository Issue Contribution shape Focused validation
Base #2278 First-run troubleshooting decision tree Internal-link review and git diff --check
Base #2279 Focused JSON output example Documented read-only command and link review
Base #2280 Downstream release smoke test Public release-doc review and git diff --check
base-cli #344 Five-minute run_app consumer recipe Recipe run, focused test, and git diff --check
base-cli #345 Strict Node JSON consumer validation Node contract command and link review
base-cli #346 Optional output-format dependency guide Metadata/message review and git diff --check
base-bash-libs #491 Bash 4.2 support and validation quickstart Focused help/validation command and link review
base-bash-libs #492 Consumer-kit contribution path Focused consumer-kit BATS test and link review

The queue is deliberately documentation-heavy for its first pass. Promote a code issue to good first issue only after its acceptance criteria, test fixture, and public setup path are equally explicit. Remove the label if a task turns out to need private architecture knowledge or cross-repository changes.

Monthly review

The first monthly triage review is scheduled for 2026-10-01. The review output belongs in a dated comment on this issue (#2268) and should link every decision back to the affected issue or discussion. The baseline to carry into that review is:

  • eight starter issues listed above, all open and unassigned;
  • the shared labels present in Base, base-cli, and base-bash-libs;
  • public Discussions enabled at the organization front door; and
  • no response-time promise beyond the 7/14-day working targets.

At each review, record the number of new, ready, claimed, blocked, in-review, and done issues; identify one or two next actions; remove stale good first issue labels; and note any intentional closure or deferral. A useful review can report that no change was needed. Do not manufacture prompts, comments, or activity to make the numbers look healthier.

Discussion handoff

Use the community support workflow when a Discussion becomes actionable. The issue owns acceptance criteria; the PR owns implementation and validation; the original discussion remains linked as design context. Security reports bypass public triage and use a private advisory.