Skip to content

Plugin Secure Integration Tests #206

Plugin Secure Integration Tests

Plugin Secure Integration Tests #206

Triggered via schedule July 9, 2026 09:00
Status Failure
Total duration 3m 57s
Artifacts
Matrix: scheduled
Matrix: secure-integration-tests / secure-integration-tests
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 2 notices
scheduled (main) / Secure Integration Tests / Stack 8.current (Snapshot)
Process completed with exit code 1.
scheduled (main) / Secure Integration Tests / Stack 8.current (Snapshot)
Install failed with an unexpected code: 1. Stopping build.
scheduled (11.x) / Secure Integration Tests / Stack 9.next (Snapshot)
Failed to pull logstash-9.next. Likely due to missing DRA build.
scheduled (main) / Secure Integration Tests / Stack 9.next (Snapshot)
Failed to pull logstash-9.next. Likely due to missing DRA build.