Skip to content

Fix issue with self reference constants #590

Fix issue with self reference constants

Fix issue with self reference constants #590

Triggered via push November 25, 2025 21:21
Status Failure
Total duration 1m 35s
Artifacts

integrate.yaml

on: push
Unit test  /  Supported Versions Matrix
3s
Unit test / Supported Versions Matrix
Code Coverage  /  Code Coverage
18s
Code Coverage / Code Coverage
Coding Standards
21s
Coding Standards
Matrix: Dependency analysis / Dependency Analysis
Matrix: Lint root / Lint yaml & Composer
Matrix: Static analysis / Static Code Analysis
Matrix: Unit test / Tests
Integration test  /  Supported Versions Matrix
3s
Integration test / Supported Versions Matrix
Matrix: Integration test / Tests
Fit to window
Zoom out
Zoom in

Annotations

30 errors
Code Coverage / Code Coverage
Process completed with exit code 1.
Integration test / Tests (8.5, locked)
Process completed with exit code 1.
Integration test / Tests (8.2, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.2, highest)
The operation was canceled.
Integration test / Tests (8.3, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.3, highest)
The operation was canceled.
Integration test / Tests (8.1, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.1, locked)
The operation was canceled.
Integration test / Tests (8.4, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.4, highest)
The operation was canceled.
Integration test / Tests (8.1, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.1, lowest)
The operation was canceled.
Integration test / Tests (8.3, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.3, locked)
The operation was canceled.
Integration test / Tests (8.4, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.4, locked)
The operation was canceled.
Integration test / Tests (8.5, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.5, highest)
The operation was canceled.
Integration test / Tests (8.1, highest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.1, highest)
The operation was canceled.
Integration test / Tests (8.2, locked)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.2, locked)
The operation was canceled.
Integration test / Tests (8.2, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.2, lowest)
The operation was canceled.
Integration test / Tests (8.4, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.4, lowest)
The operation was canceled.
Integration test / Tests (8.5, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.5, lowest)
The operation was canceled.
Integration test / Tests (8.3, lowest)
The strategy configuration was canceled because "integration-tests.tests._8_5_locked" failed
Integration test / Tests (8.3, lowest)
The operation was canceled.