ddl: add more corner tests for active-active | tidb-test=release-8.5-20260121-v8.5.5 #8975
integration-test-dumpling.yml
on: pull_request
Matrix: integration-test
Annotations
7 errors
|
integration-test (8.0.26)
Process completed with exit code 2.
|
|
integration-test (5.7.35)
The strategy configuration was canceled because "integration-test._8_0_26" failed
|
|
integration-test (5.7.35)
The operation was canceled.
|
|
integration-test (8.0.22)
The strategy configuration was canceled because "integration-test._8_0_26" failed
|
|
integration-test (8.0.22)
The operation was canceled.
|
|
integration-test (8.0.37)
The strategy configuration was canceled because "integration-test._8_0_26" failed
|
|
integration-test (8.0.37)
The operation was canceled.
|