GX ESS Scheduled Chare Levels #215
DuncanGardiner
started this conversation in
Ideas
Replies: 1 comment 1 reply
-
|
I use the "min soc" setting for this. Incressing this to 60 or 100% starts charging the battery. Works works great, ana can also be variable when using hourly based grid Tarifs. |
Beta Was this translation helpful? Give feedback.
1 reply
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
Hi I am based in Portugal and have a Multiplus ii 48/8000 setup with a ESS assistant. The Ess assistant allows my system to be connected to the grid to push or pull energy from my supplier.
I normally only push excess energy to the supplier and run my loads in the house for the most part in an off grid state (via a battery bank).
On occasion when the batteries get very low due to rain days or heavy cloud. I use the scheduled charged option within ESS section of the GX to charge my batteries from the grid at night (thus buying power when its cheaper here).
My question is:
Is the toggle for the schedules (the GX has 5 schedules that you can set) within the ESS section exposed via Mod-Bus-TCP, and can I interact withg them from HA.
I'd like to build an autmation that activates a scheduled charge or deactivates a scheduled charge when conditions within HA are met?
Kind regards Duncan
Beta Was this translation helpful? Give feedback.