Skip to content

Latest commit

 

History

History
108 lines (96 loc) · 6.66 KB

README.md

File metadata and controls

108 lines (96 loc) · 6.66 KB

Architecture Decision Records

History by reference (I9): adjudication, alternatives, and calibrated guarantees live here so the normative documents stay short. The planning history behind these records is the v12+errata design review (12 rounds, including two external reviews and a self-improvement addendum, adjudicated decision by decision).

Current M6 control decisions are ADR 0012 and ADR 0013. The current M7 channel decisions are ADR 0014, which settles what a message is, and ADR 0015, which settles who may read and answer one. ADR 0016 settles how immutable facts remain distinguishable from absence and how exact historical writer eras retain only their original authority. Accepted ADR 0017 records the M7.1 decision that exact panel membership is an authored port map, not inferred connector liveness.

Accepted ADR 0018 and the frozen M8 plan define a Linux-first leased process boundary, complete live executor profiles, and gateway-only initial authentication for the v1 profile. PR A–D are merged. No live model adapter existed at that acceptance; the adapters built since are listed under M8 in ARCHITECTURE.md. Accepted ADR 0021 supersedes the authentication clauses for the explicit v3 profile only; gateway v1 is unchanged and unselected. Operator deployment is separate from GitHub Actions proof runs.

Accepted ADR 0019 records the owner's GitHub Actions selection and the explicit adjustment from an immutable hosted image to per-host qualification. It supersedes only M8 rev 1's CI-host-image requirement; the original plan and ADR 0018 keep their historical bytes and all other proof obligations remain governing. The qualification workflow investigates prerequisites only; the separate required native lane establishes PR B's containment evidence. Neither enables a credential-bearing live executor. The native-authentication investigation changes no accepted ADR and records the additional proof a successor would need.

Proposed ADR 0020 and M8 rev 2 presented a principal-attested successor for decision after the credential-free startup and recovery gates: vendor-managed account custody in a workspace-free native zone, separate contained tool workers, versioned authority, and Codex-first sequencing. They remain proposed, neither accepted nor rejected, after ADR 0021 was accepted as the narrower alternative; ADR 0020's proposed description-4 allocation is retired in favour of ADR 0021's, and its text is unchanged. Account access, production conformance and live calls remain separate gates.

Accepted ADR 0021 (2026-09-13) and M8 rev 3 select the owner's immediate Claude Code/Codex subscription route: one private operator binding, with vendor principal/workspace continuity explicitly unverified, under unchanged physical containment, mediated tools, grants and lifecycle proofs. It supersedes ADR 0018 only for the explicit v3 profile. Acceptance authorizes credential-free N1 construction; N4 and N5 need separate explicit operator authorization per provider, the private Linux deployment is a separate operator decision, and no credential, account inspection, model call or live profile is authorized. ADR 0019 still governs hosted Linux evidence.

Accepted ADR 0022 records an ADMIN-only, idempotent escape from unreconcilable active capability accounting through the existing lost state. It specifies a co-located fenced command receipt and explicit versioned public accounting; it proves no physical cleanup. The owner accepted the decision and implementation sequence on 2026-10-13, tracked by #143. Acceptance does not implement or expose disposal. Implementation follows in separate provenance, accounting and command slices after #132's merge.

Accepted ADR 0023 records run-scoped ordinary attestation identities and a positively witnessed, closed historical v1 era. The owner accepted the proposal and implementation in the 2026-11-05 wave. Policy IDs, historical proof bytes and one-proof/one-move semantics remain unchanged; implementation evidence belongs in the delivery PR.

Accepted ADR 0024 records the owner's 2026-11-05 adoption for #376. The decision allows bounded native usage observations in the existing journal and preserves unknown monetary values and the previous custody decisions.

Accepted ADR 0025, for #442, keeps native executors unavailable and admits an ordinary consumer run, the change-review advice route, only as one owner-permitted run. The owner accepted it on 2026-11-16 (decision record); acceptance authorizes credential-free construction of that one graph, and no live window, permit or model call.

Accepted ADR 0026 has a consumer READ spend one counted slot of a standing, conditioned owner approval. The supervisor checks it mechanically before any process and again against the actual pins. It replaces the in-window manual approval of each challenge. It supersedes only ADR 0025's per-run approval clauses, keeps the rejection of a standing permit, and changes nothing under src/.

Accepted ADR 0027, for #453, follows the owner-directed 2026-11-17 structural-advice delivery wave and independent review. It extends only the bounded advice summary with aligned kinds, changed-part facts and an exact whole-module AST-change bit. Acceptance authorizes credential-free construction only. Historical V1 evidence, the installed controller and standing approval remain unchanged; live operation is separately selected. The decision artifact is retained byte-for-byte after adoption.