Merge pull request #2170 from gofiber/dependabot/go_modules/aerospike… #383
Annotations
5 errors
|
Tests (1.23.x, 6)
Process completed with exit code 1.
|
|
Tests (1.23.x, 7)
The strategy configuration was canceled because "Tests._1_23_x_6" failed
|
|
Tests (1.24.x, 6)
The strategy configuration was canceled because "Tests._1_23_x_6" failed
|
|
Tests (1.24.x, 7)
The strategy configuration was canceled because "Tests._1_23_x_6" failed
|
|
Tests (1.24.x, 7)
The operation was canceled.
|