Skip to content

Routing Solver takes loading time for unused vehicle too #1066

@shashanktrivedi2018

Description

@shashanktrivedi2018

Hi,

There are five routes as listed below, only two are used (route 2 and route 4). there is a resource constraints at depot i.e num of docks are only 2 with loading and unloading time as per vehicle.

Now why routing solver takes loading time for the vehicle/routes which is not used. Any help is deeply appreciated.

Route 0: 0 Load(0) Time(0, 0) -> 0 Load(0) Time(0, 0)
Route 1: 0 Load(0) Time(2, 2) -> 0 Load(0) Time(2, 2)
Route 2: 0 Load(0) Time(4, 4) -> 5 Load(0) Time(100, 120) -> 8 Load(5) Time(114, 134) -> 7 Load(10) Time(122, 142) -> 9 Load(15) Time(150, 150) -> 12 Load(20) Time(158, 158) -> 11 Load(25) Time(166, 166) -> 0 Load(30) Time(176, 176)
Route 3: 0 Load(0) Time(4, 4) -> 0 Load(0) Time(14, 14)
Route 4: 0 Load(0) Time(24, 24) -> 1 Load(0) Time(24, 92) -> 2 Load(5) Time(33, 101) -> 19 Load(10) Time(42, 110) -> 6 Load(15) Time(120, 120) -> 24 Load(20) Time(127, 127) -> 17 Load(25) Time(142, 142) -> 22 Load(30) Time(155, 155) -> 21 Load(35) Time(164, 164) -> 23 Load(40) Time(170, 170) -> 20 Load(45) Time(181, 181) -> 18 Load(50) Time(191, 191) -> 16 Load(55) Time(205, 205) -> 14 Load(60) Time(214, 214) -> 15 Load(65) Time(226, 226) -> 13 Load(70) Time(237, 237) -> 10 Load(75) Time(247, 247) -> 4 Load(80) Time(255, 255) -> 3 Load(85) Time(265, 265) -> 0 Load(90) Time(272, 272)

Thanks
Shashank

Metadata

Metadata

Assignees

Labels

Help NeededModeling/Usage problemSolver: RoutingUses the Routing library and the original CP solver

Type

No type

Projects

No projects

Milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions