Open
Description
We cut a release branch for the 2.8.0 release.
Our plan from this point from this point is roughly:
- Phase 1 (until 7/7/25): work on finalizing the release branch
- Phase 2 (after 7/7/25): perform extended integration/stability/performance testing based on Release Candidate builds.
This issue is for tracking cherry-picks to the release branch.
Refer pytorch/pytorch#156745