Skip to content

debug in ci

debug in ci #100

Triggered via push September 11, 2025 04:59
Status Failure
Total duration 32s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.11)
Process completed with exit code 1.
build (3.9)
Process completed with exit code 1.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.13)
Process completed with exit code 1.
build (3.13)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed