fix(deps): upgrade plpygis #713
continuous-integration.yml
on: pull_request
changes
6s
Build and push base postgres image
7s
Build and push base pyrust
13s
Matrix: test
Annotations
3 errors and 2 warnings
|
test
Process completed with exit code 4.
|
|
test (--resolution lowest-direct)
The job was canceled because "job" failed.
|
|
test (--resolution lowest-direct)
Process completed with exit code 4.
|
|
test
No file matched to [**/uv.lock,**/requirements*.txt]. The cache will never get invalidated. Make sure you have checked out the target repository and configured the cache-dependency-glob input correctly.
|
|
test (--resolution lowest-direct)
No file matched to [**/uv.lock,**/requirements*.txt]. The cache will never get invalidated. Make sure you have checked out the target repository and configured the cache-dependency-glob input correctly.
|