Goal
Move the cloud deployments of YDB UI and its admin interface away from the legacy ALB Ingress Controller to a supported controller. Preserve availability and useful monitoring signals while enabling clearer error handling.
Plan
Acceptance
The migrated deployments retain their existing user-facing behavior. Error handling and monitoring are verified, and rollout results and rollback steps are documented. Do not combine this work with changes to alert thresholds or notification channels. KZ deployments are out of scope.
Related: #4177.
Reference: General Gwin migration guide.
Goal
Move the cloud deployments of YDB UI and its admin interface away from the legacy ALB Ingress Controller to a supported controller. Preserve availability and useful monitoring signals while enabling clearer error handling.
Plan
Acceptance
The migrated deployments retain their existing user-facing behavior. Error handling and monitoring are verified, and rollout results and rollback steps are documented. Do not combine this work with changes to alert thresholds or notification channels. KZ deployments are out of scope.
Related: #4177.
Reference: General Gwin migration guide.