-
Notifications
You must be signed in to change notification settings - Fork 2k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[PERFSCALE-3706] Fix health-check for private vlan
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68958
opened Sep 5, 2025 by
josecastillolema
Loading…
cert-manager: add retry for getting the packagemanifest
lgtm
Indicates that a PR is ready to be merged.
#68957
opened Sep 5, 2025 by
rphillips
Loading…
Add 4.21 periodics to the MCO suite
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#68954
opened Sep 5, 2025 by
RishabhSaini
Loading…
vsphere regression node density heavy 419
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68953
opened Sep 5, 2025 by
skordas
Loading…
adding a cleanup to the evaluation tests
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#68951
opened Sep 5, 2025 by
andrej1991
•
Draft
WIP Debug cluster ovn-ipv6-fips
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#68949
opened Sep 5, 2025 by
asood-rh
Loading…
[AWS-IPSEC] [UDN] Loaded upgrade - 24 nodes - 4.18z -> 4.20 Upgrade
#68948
opened Sep 5, 2025 by
shyadav10
Loading…
Add sustaining Engineers in OWNERS_ALIASES
do-not-merge/invalid-owners-file
Indicates that a PR should not merge because it has an invalid OWNERS file in it.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68947
opened Sep 5, 2025 by
jkaurredhat
Loading…
CMP-3385: Consolidate periodic testing for 4.17, 4.18, add periodic testing for 4.19
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#68943
opened Sep 5, 2025 by
rhmdnd
Loading…
Tmp disabling failing tests in istio release-1.27
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68940
opened Sep 5, 2025 by
FilipB
Loading…
[BM/CPT] Fix censor
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68938
opened Sep 5, 2025 by
josecastillolema
Loading…
Remove verified labels from bpfman repositories
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68937
opened Sep 5, 2025 by
danilo-gemoli
Loading…
openshift-logging: Update Loki version used for testing releases
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#68934
opened Sep 5, 2025 by
xperimental
Loading…
CMP-3726: Update ROSA version used for compliance-operator CI
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#68933
opened Sep 5, 2025 by
yuumasato
Loading…
USHIFT-6088: Remove cherry-pick-approved label config
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68932
opened Sep 5, 2025 by
pacevedom
Loading…
[PERFSCALE-4126] Improve SSM description
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68931
opened Sep 5, 2025 by
josecastillolema
Loading…
new jobs for assisted-chat
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
[Debug]Launch a disconnected cluster
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#68924
opened Sep 5, 2025 by
BaiyangZhou
Loading…
Debugging workload cases
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#68923
opened Sep 5, 2025 by
ropatil010
Loading…
telco: make konflux jobs mandatory
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68922
opened Sep 5, 2025 by
abraham2512
Loading…
WIP: Add new module for modular architecture MR
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#68914
opened Sep 4, 2025 by
lucferbux
Loading…
loaded upgrade on nutanix 419-420
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68912
opened Sep 4, 2025 by
skordas
Loading…
Previous Next
ProTip!
Type g p on any issue or pull request to go back to the pull request listing page.